Design Risk Register CDM Template

CDM Design Risk Register image 1
£10+VAT
(£12.00 inc.VAT)

Document

  • Instant access
  • 23 pages
  • Online editor
  • Your business name
  • Edit for 30 days
  • PDF download

Membership

  • 840+ documents
  • Individual plans
  • Team plans
  • Your business logo
  • Unlimited edits
  • Fully branded

Document Description

Create your document in minutes with this ready to use Design Risk Register CDM template. Use the quick and easy editor to add your details, make changes, and download a completed document branded with your business name.

This CDM Design Risk Register Template provides a structured starting point for identifying, assessing and managing health and safety risks associated with the design of a construction project.

Under the Construction (Design and Management) Regulations 2015 (CDM 2015), designers must eliminate foreseeable health and safety risks through the design process, so far as is reasonably practicable, and reduce or control any risks that cannot be eliminated.

CDM designers include architects, structural engineers, M&E engineers, and any other person contributing to design work on a construction project.

This template is designed for designers and principal designers, helping you record design-related hazards, document decisions made to eliminate or reduce risks, and communicate significant residual risks to other members of the project team.

The design risk register template helps you record design elements, identified hazards, associated risks, design control measures, residual risks and any further actions required. It supports the ongoing management and coordination of design risks relating to construction, use, maintenance and eventual demolition.

The template contains a checklist of over 210 design elements and health and safety considerations, and can be adapted to suit the particular project, design and scope of work, helping you create a project-specific document that can be reviewed and updated as the design develops.

Want more CDM templates? Our CDM Packs give you 1 year of access to a discounted bundle of CDM documents for multiple projects. Get your pack →

The template guides you through the key information needed to complete your Design Risk Register CDM document. You'll have 30 days' access to the online template, with the option to download your completed cdm document as a non-editable PDF to keep, share and use within your business, with your business name displayed in the header of each page.

Contents

This 23 page document includes:


How do I edit this document?

This Design Risk Register CDM template can be edited online within your browser. Editing is quick and simple, but if you need more time, there's no hurry to finish your document today - you get 30 days use of the template and online editor to create your document.

When you complete your order, the document can be found in your account under 'Documents'. You can edit the document online from your HASpod account.

How do I download this document?

Download in PDF format for maximum compatibility across devices - no special software required. Once downloaded you can save, print and use your Design Risk Register CDM document within your business for as long as you need it.

After making your edits, click the download button to get your PDF - we will add your business name in the header for you.

Get unlimited access to every document on the Documents Plan.