CDM Template
Construction Phase Plan

CDM Construction Phase Plan image 1
£30+VAT
(£36.00 inc.VAT)
arrow

Document

Instant access
36 pages
Online editor
Your business name
Edit for 30 days
PDF download

Membership

425+ documents
Individual plans
Team plans
Your business logo
Unlimited edits
Fully branded

Document Description

Create your document in minutes with this ready to use Construction Phase Plan CDM template. Use the quick and easy editor to add your details, make changes, and download a completed document branded with your business name.

This Construction Phase Plan CDM template enables you to create a professional construction phase plan (CPP) document for your project as required under the latest CDM 2015 regulations.

A construction phase plan is a CDM document that is required on every construction project. It must be developed by the principal contractor (or contactor if only one).

You can use this document template to develop your construction phase plan. It has been pre-completed by health and safety CDM experts, and is ready for you to edit and add your project specific details such as the project team and a description of the project.

This Construction Phase Plan (CPP) CDM template has been developed in accordance with the requirements of the CDM regulations.

You can use the Construction Phase Plan CDM template as it is, in your business, and we will add your business name at the top of each page. The template is pre-completed for the activity, and you can edit it as needed to produce a site specific document for your project.

This Construction Phase Plan CDM template can be edited online within your browser. Editing is quick and simple, but if you need more time, there's no hurry to finish your document today - you get 30 days use of the template and online editor to create and download your document.

Download in PDF format for maximum compatibility across devices - no special software required. Once downloaded you can save, print and use your Construction Phase Plan CDM document within your business for as long as you need it.

Contents

Introduction, CDM Standards & Objectives, Safety Standards & Objectives, Project Description, Project Directory, Subcontractor Directory, Project Management, Responsibilities, Project Delivery, Health & Safety Goals, Safe Systems of Work, Site Rules, Accident Procedures, Reporting of Accidents, Investigation Procedures, Emergency Contacts, Accident Procedures, Subcontractor Management, Communication, Monitoring Arrangements, Control of Site Safety Risks, Access, Delivery & Waste Removal, Services, Ground Conditions & Excavations, Site Traffic & Vehicle Movements, Plant & Equipment, Existing Structures & Fragile Materials, Work at Height / Falls, Confined Spaces, Lifting Operations, Work On or Near Water, Other Significant Safety Risks, Control of Health Risks, Asbestos, Hazardous Materials & Substances, Contaminated Land, Noise, Vibration & Dust, Manual Handling, Other Health Risks, Risk Register, Fire Procedures, Health and Safety File.



How do I edit this document?

Once you have completed your order, the document can be found in your account under 'Documents'. You can edit the document online from your HASpod account.

How do I download this document?

Once you have made any edits, click the download button to get your PDF - we will add your business name in the header for you.

Get unlimited access to every document on the Documents Plan.